Straight length plus one total fitting length
Inputs: 100 ft straight length and 45 ft total source-based fitting length.
Calculation: Add the entered lengths.
Result: 145 ft TEL.
Pressure loss and static pressure
Combine straight lengths and documented fitting allowances to total a duct route’s effective length.
Add user-supplied fitting equivalent length to straight duct length for one defined airflow path, either as one total or an auditable fitting schedule.
Total effective length expresses a selected path as straight duct plus the equivalent straight length attributed to its fittings. It is a method-dependent pressure-accounting device, not the installed material length.
Fitting equivalent lengths must belong to the same sizing method and applicable geometry. A pressure coefficient cannot be pasted into a feet column without a compatible conversion.
TEL = straight length + total fitting equivalent length; schedule TEL = straight length + Σ(equivalent lengthᵢ × quantityᵢ)
TEL and straight length are in feet. Each schedule equivalent length is ft per fitting; quantity is a count. Σ means sum the quantity-weighted equivalent lengths along the selected route.
Use TEL only with a compatible friction-budget method. The fitting subtotal is not extra installed duct and should not be reused as material takeoff length.
Inputs: 100 ft straight length and 45 ft total source-based fitting length.
Calculation: Add the entered lengths.
Result: 145 ft TEL.
Inputs: 100 ft straight length and rows 20 ft×2, 15 ft×1 and 5 ft×3.
Calculation: 100 + (20×2 + 15×1 + 5×3) = 170 ft.
Result: 170 ft TEL; supplied fitting equivalent-length total is 70 ft.
Use the complete route being assessed. Parallel routes are alternatives; adding their lengths together does not describe a single air path.
In schedule mode enter one fitting equivalent length and its count per row. Do not also include those same fittings in a separate lumped allowance.